Rendering Our Renovations

Announcement Date : Apr 1 , 2007

Suite201 (1)

The smaller 2nd floor suite in 2004, before being completely remodeled.

The remodeling of the 2nd floor of our building was completed in 2007 after having started earlier the same year. In late 2005, we moved back into the larger suite of the office and began using the smaller suite as storage until early 2007, which is when our remodeling began. When construction was completed, the entire 2nd floor was one large office suite with room for 20 recruiters and the smaller suite now contains our large, technologically advanced conference room, a full kitchen and eating area, and a temperature-controlled room for our technology assets.

201Suite

The smaller 2nd floor suite as it looks today, looking in the direction the old picture was taken from.